Freight Forwarding Considerations for Construction Materials

Construction freight is heavy, low in value for its weight, and delivered to places that were not designed to receive vehicles. The site is usually the hard part.

A telehandler lifting a bundle of long pipes into the open side of a curtainsider semi-trailer.

Common requirements

What shipments in this sector usually need.

  • Vehicles able to carry dense loads within permitted weights, with the load distributed rather than concentrated.
  • Unloading equipment carried on the vehicle where the site has none, decided at the point of booking.
  • A vehicle size compatible with site access, which may mean several smaller deliveries instead of one large one.
  • Delivery to a booked slot, with the understanding that early arrival can be as unwelcome as late arrival.
  • Weather protection for moisture-sensitive materials, and clarity on whether they can stand in the open on arrival.

Quoting

What to describe in a request.

  • Give the weight of the consignment and describe how it is packed, since dense freight is limited by weight rather than space.
  • Describe site access honestly: surface, gradient, entrance width, overhead obstructions and turning space.
  • State what unloading equipment exists on site, and whether the vehicle must provide its own.
  • Confirm the delivery window and whether the site operates a booking system with penalties for missing it.
  • Identify brittle, surface-sensitive or moisture-sensitive materials so they are not loaded as though they were robust.
  • Say whether the delivery point is likely to move as the build progresses, which affects instructions for the driver.